Hubbard Branch Elementary

Information

    • Architect: Huckabee
    • Delivery Method: CMAR
    • Contractor: American Constructors

Status

  • Under Construction

  • Project Update - March 2024

    Hubbard Branch Elementary is under construction at 1651 O.T. Tyler Drive in Belton.

    Hubbard Branch Elementary will be built to accommodate 800 students and was designed in accordance with Belton ISD’s 2022 Educational Specifications, which include design considerations that will enhance the BISD students’ learning experience. In alignment with the 2022 Educational Specifications, Hubbard Branch Elementary will include a variety of spaces and furnishings that are diverse, flexible, and adaptable to promote collaborative teaching and learning.

    March 2024 Update: Construction activity in the kitchen, cafeteria, gym, library, and administrative office areas is scheduled for pre-final inspections by the design team the week of March 18, 2024. Construction activity in the two-story classroom wings is moving forward quickly. Overall progress remains on schedule for an April 2024 completion.