Belton High School Career & Technical Education Addition & Band Hall/Fine Arts

    • Architect: O’Connell Robertson
    • Delivery Method: CMAR
    • Contractor: Core Construction

Status

  • Under Construction

Belton High School Existing CTE Upgrades

    • Architect: O’Connell Robertson
    • Delivery Method: CMAR
    • Contractor: Core Construction

Belton High School Interior Finishes Renovation

    • Architect: O’Connell Robertson
    • Delivery Method: CMAR
    • Contractor: Core Construction

Status

  • Under Construction

Status

  • Under Construction

  • Project Update - March 2024

    The 2022 Bond included funding for Career and Technical Education (CTE) and Fine Arts additions at Belton High School, upgrades for the existing CTE spaces, and other capital improvements and renovations.
     
    Following the passage of the 2022 Bond, the district collaborated with stakeholders to identify program requirements. Architectural design began in the fall of 2022 and was completed by O’Connell Robertson Architects in April 2023. 

    The projects include -

    Fine Arts Addition:
    The building design includes a new band hall with ensemble, percussion, and office and storage spaces for instruments, uniforms, and color guards. 

    Career and Technical Education (CTE) Addition:
    The building designs include a CTE Addition that includes classroom spaces for ROTC, AV, and Culinary Programs, portrait/broadcasting/green studio spaces, and a kitchen and cafe. 

    Career and Technical Education (CTE) Renovation/Upgrades
    The designs for the existing CTE building renovations include upgrades to the construction shop, wood shop, and classrooms for agriculture and vet tech programs.

    March 2024 Update: Dry-in at both building additions is complete.  Construction crews are now moving very quickly with MEP rough-in and interior wall framing.  Additionally, crews will use the Spring Break period to replace existing flooring and install new paint in the corridors of the existing building.  Interior work within the main building was originally scheduled for Summer 2024, but work is also accelerating in these areas.  Overall construction progress remains on schedule for an August 2024 completion.